WOP Management Guide

Managing your WOP

Use this guide to update your WOP, record progress, prepare reports and complete WOP closure.

Sections in this guide

WOP Management is where a partnership's team plans its work, records results and reports to the GWOPA.

The new portal introduces results-based management (RBM) for WOPs. Partners plan the results they want to achieve, link activities to those results and measure progress against agreed baselines and targets.

The help links on WOP screens open this guide in a new tab, so your WOP and any unsaved form stay open.

Log indicator progressPrepare a reportRespond to review comments

This guide is constantly being updated as the portal changes. Contact your focal point if the screen and guide differ.

What has changed

AreaPrevious portalNew portal
PlanningActivities and outputs were listed by working area, with performance outcomes on a separate tab.One results chain links impact, working areas, performance outcomes, capacity outcomes, outputs and activities.
Project yearsYou chose a Project Year and recorded activities, outputs, KPIs and scores within it.Project years are gone. The WOP has one continuous plan, and each update carries its own date.
TargetsAchieved and target figures were shown for the selected year.Each indicator has one baseline and one target, each with a date.
Measuring progressActivity progress was entered as a percentage.For numeric indicators, the portal calculates achievement from the baseline, target and latest value. Activities have a status instead of a percentage.
ReportingReports were created with Create New Report for chosen dates, years and sections.Narrative reports follow a six-month schedule and are written, submitted and reviewed in the portal. Submitted versions are preserved.
Follow-upNot available as a separate screen.Monitoring → Implementation alerts and My Workspace show what needs attention.
ClosureNot available as a separate screen.Close-out records the final checks and sends them for review.
Linkage to the results frameworkProject indicators had no connection to programme level reporting.An indicator in your project's results chain can be linked to an indicator in a programme's Results Framework, such as EU WOP. Programme indicators are usually broader than one project, so several projects contribute evidence to the same one. Once linked, your reported progress rolls up to the programme automatically, so you report it once, in your project, and it is not entered twice. Not every indicator needs a link. One is used only when it genuinely measures what the programme indicator tracks. An indicator that only counts delivery, such as documents produced or people trained, is not linked to an outcome. Your GWOPA focal point sets up and reviews these links. You will see one noted against an indicator once it has been made, and you report on it the same way as any other indicator.

Reporting periods remain for narrative reports only. Older records can still show a year or cycle label. Reports from the previous portal are filed as earlier reports under their reporting periods, so you do not need to submit them again.

Who can do what

What you can do depends on your role on each WOP. Open the WOP and select Team & access to see your role in the Role column. In this guide, Administrator means the Administrator role on a WOP. It does not mean a portal administrator.

ActionViewerContent ContributorAdministrator
See the WOPYesYesYes
Edit the results chain, indicators, progress, capacity, partnership health and follow-up on late activitiesNoYesYes
Edit the title, description, organizations, financial contributions, Sustainable Development Goal (SDG) targets and platformsNoNoYes
Submit a draft or returned WOPNoYesYes
Write and submit period reports, and prepare and submit closeoutNoYesYes

Your GWOPA focal point handles the WOP's dates, its programme and changes to the team, and GWOPA reviews what you submit.

WOP management and public WOP information are separate

WOP Management requires a sign-in. Partner accounts see only the WOPs they have a role on. Public WOP profiles and the WOPs Observatory show information GWOPA has published and give nobody access to your WOP's records. A document appears on the public profile only after GWOPA approves it.

Saving and submitting

Saving keeps your work in the portal. It sends nothing for review. GWOPA reviews your work only when you submit one of these three records.

What you submitWhereWhat must be completeWhat happens next
A draft or returned WOPSubmit at the top of the WOP pageThe five checks belowStatus becomes Submitted. GWOPA approves it, which makes it Active, or returns it.
A period reportSubmit to GWOPA on the report, or Submit on the Reports tabThe WOP is Active, has a GWOPA focal point, and has at least one indicator update dated within the periodThe report becomes read-only. GWOPA verifies it or returns it for changes.
Project closeoutSubmit closeout on the Close-out tabSee Complete WOP closureStatus becomes Closeout awaiting review. GWOPA approves it, which makes the WOP Complete, or returns it.

The five checks for submitting a WOP

If an item is missing, the portal lists it and does not submit the WOP.

  • The WOP has start and end dates, set by GWOPA.
  • A GWOPA focal point is assigned by GWOPA.
  • At least one operator is listed, and each operator's profile includes organization type, main services and service level. See An operator profile is incomplete.
  • At least one working area exists.
  • At least one reporting period exists.

Find your WOP

  1. Select WOP Management → WOP Projects. Partner accounts open on this page after signing in.
  2. Choose All WOPs, Needs my action, Ongoing, Completed or Drafts.
  3. Search by title, serial number or description, or use Filters.
  4. Select the title to open the WOP.

Drafts and WOPs that GWOPA returned are under Needs my action. Submitted and Closeout awaiting review WOPs appear only under All WOPs. If you have one WOP, the portal opens it directly the first time you sign in. My Workspace lists your tasks, including reports to prepare, returned work, late activities to follow up and indicators with no reading for the period.

Tabs on a WOP

TabUse it to
DashboardSee project health, activities, risks and reporting status
OverviewCheck the summary, organizations, SDG targets, platforms and funding
LogframePlan the WOP in Results chain, Indicators and progress, Utility KPIs (baselines) and, for a WOP in a programme, Programme contribution
MonitoringSee what is due in This period, follow up late activities in Implementation alerts and agree Partnership health
ReportsWrite and submit Period reports and upload Files
Close-outPrepare and submit close-out. It appears six months before the end date
Team & accessSee who has access and in what role. It is at the far right of the tabs

Check details, partners and team

Open your WOP and select Overview. An Administrator on the WOP can change the following.

  • To change the title and description, go to WOP summary and select Edit.
  • To add an operator, go to Water and/or sanitation operators and select Add operator. Enter the organization, its role and whether it is the primary operator.
  • To add a supporting organization, select Add supporting org and choose its roles.
  • To record funding, go to Financial contributions and select Add contribution. Enter Planned in-kind and Planned cash. Leave Actual in-kind and Actual expenditures blank until they are known.

A Content Contributor can also update baseline utility KPIs in Logframe → Utility KPIs: select the edit icon beside the mentee and enter the key performance indicator (KPI) values and Baseline date. Saving replaces the earlier baseline, and no history is kept.

Before you finish, check the dates, focal point and programme in WOP summary. To correct them or change the team, send your focal point the details, including each person's name, email, organization and role.

Set up the results chain

  1. Open your WOP and select Logframe → Results chain. Select Expand all if a working area is collapsed.
  2. Work from the top down: Add impact, Add working area, Add performance outcome, Add capacity outcome, Add output, then Add activity. Each working area has one performance outcome.
  3. For each activity, enter the Title, Responsible partner, Status, Start date and Completion date. If you leave the dates blank, the activity uses the dates of the output above it.
  4. Give every output at least one indicator with a baseline and a target, and every activity a completion date. A row that lacks one shows a warning, and the same gaps are listed when you submit. They do not block submission. An activity with no completion date of its own cannot show as overdue.
  5. Select Add on a row to put a progress update, indicator, risk, assumption or MOV (means of verification) file on it. A row shows a count for what it already holds, and selecting a count opens that list. To see past changes, select History.

Example of work done leading to a change in performance

This example is for illustration only. Read it from the bottom up.

LevelExampleThe question it answers
Performance outcomeNon-revenue water falls from 45% to 35%How has the utility's performance changed?
Capacity outcomeTechnicians apply the leak repair procedure in their daily work, without the mentorWhat does the utility now do differently?
Output 112 technicians trained in leak detectionWhat did the work directly produce?
Output 2Leak repair procedure approvedWhat did the work directly produce?
ActivitiesRun a five-day course (under Output 1). Draft and review the procedure (under Output 2).What will we do?

Training and an approved procedure support the change, but neither explains a fall in non-revenue water on its own. Staff must apply what they learned, and the result may also depend on other activities and investments, such as metering or pipe replacement. Note those in the performance outcome's Assumptions or in your report.

Enter baselines and targets

  1. Open your WOP and select Logframe → Indicators and progress.
  2. To change an indicator, select Edit baseline & target. To add one, go to Results chain, select Add on the row, then Indicator.
  3. Enter the Indicator description, Measure, Unit and Desired direction. For water losses, select Decrease is better.
  4. Enter the Baseline value and the Baseline date it was measured.
  5. Enter the Target value and the Target date it should be reached by.
  6. Add the Means of verification and select Save.

Values must be numbers unless the measure is Non-quantified. Enter a baseline of zero only when the measured value was zero. If no baseline is entered, the portal shows Baseline needed beside the latest reading, date and target, and does not calculate achievement. To remove a baseline or target, clear the field and save.

Before you finish, select Needs attention to find what is left. It lists every indicator with no baseline, no target, or no programme link or review yet.

Update progress and evidence

  1. Open your WOP and select Logframe → Indicators and progress → Due this period. It lists everything expected in the selected reporting period and shows its dates above the list. Select Log progress beside an item.
  2. To update any other indicator, select All on the same tab.
  3. In the Progress column, select Log progress or the number of updates, then + Log update.
  4. Enter the date the value was measured in As of date.
  5. Enter the value in Value. For counts, enter the running total. See Period and cumulative values.
  6. Choose the Status and add the source in Remarks.
  7. Select Save.

If the value is unavailable, leave Value empty and explain why in Remarks. Enter zero only when the measured result is zero.

Before you finish, check the As of date. An update counts towards a report only if it is dated within that reporting period. An update can't be dated in the future.

A reporting period's report opens on the period's start date. You can submit it any time after that; you don't have to wait for the period to end. Periods that haven't started appear in the schedule but not in My Workspace.

Add supporting evidence

  1. Go to Results chain and select the row's Indicators count.
  2. Select Evidence / MOV (the paperclip) beside the indicator, then + Upload file.
  3. Choose the file, add a title and select Upload.

Mark an activity as finished

In Results chain, select Edit activity and set Status to Completed. You can also log an update with the status Completed. Either one marks the activity complete and clears its follow-up. Set Status to Delayed when it is behind schedule, or to Cancelled for work that will not happen. It then no longer counts towards progress, follow-up or activity totals.

Assess capacity change

Every capacity outcome in the Results chain has a Capacity change stage indicator. Update it once every reporting period. Its row shows the stage reached and when it was assessed. Earlier assessment rounds are kept as its past updates.

  1. In Results chain, find the capacity outcome and select Add → Progress update, then choose its capacity change stage indicator.
  2. Enter the As of date and the Stage reached, from 1 to 4.
  3. For each capacity dimension that changed, choose the degree of change and the WOP contribution, and write what changed, the challenge and the evidence. Leave the other dimensions as Not rated.
  4. Select Save. The stage moves the capacity outcome's progress from its baseline towards stage 4.

Set the capacity outcome's Level when you edit it: Individual (skills and motivation), Operational (systems, routines and equipment), Strategic (leadership, strategy and culture) or Mixed. Count documents, trainings and tools on the outputs that produce them, not on the capacity outcome.

Choose the stage from what you can show has changed, not from how much of the plan is done. These examples use a leak repair programme.

StageExample of evidence
1 Diagnosing and action planningA diagnostic report on leak repair practice and an agreed action plan
2 Initial implementation of activitiesAttendance lists for the first training, and a draft procedure being tested in one zone
3 Visibility of changesJob records showing crews using the procedure, and shorter repair times in the pilot zone
4 Changes consolidatedThe procedure adopted across the utility and in its budget, and still followed without mentor support

Agree partnership health with your partners

Once each reporting period, the partners meet and agree one score for each of the eight partnership practices: Set Up, Roles and responsibilities, Meeting processes, Work processes, Communication and transparency, Trust and teamwork, Partnership adaptation and sustainability, and Resources. Score 1 (Needs improvement), 2 (Fairly good) or 3 (Very good). The form shows what each score looks like for each practice. Base the score on evidence, such as meeting minutes or actions completed.

  1. Open your WOP and select Monitoring → Partnership health, then Record assessment.
  2. Enter the date you met and tick every partner who took part. The scores count as jointly agreed only when all partners took part.
  3. Choose the agreed score for each practice. For a score of 1, or a score different from last time, say why in Why.
  4. For a score of 1, or a score lower than last time, enter the Improvement action, the partner who leads it and when it is due.
  5. Say what happened to the actions agreed last time, then select Save.

The scores are for the whole WOP. If a working area works differently from the rest, for example with a different team, select Assess [working area] separately and score it on its own; otherwise it shares the whole-WOP scores.

The tab flags what needs attention: no assessment for the last reporting period, a practice scored 1 twice running or falling from 3 to 1, a working area well below the whole WOP, an assessment not agreed by all partners, and actions past their due date. The GWOPA focal point sees the serious ones in their workspace. What the record shows sets late reports, overdue activities and in-kind contributions beside the scores. The period report includes the assessment and the actions.

Follow up late activities and risks

In an active WOP, an alert appears when an activity is past its Completion date and not complete, or when its latest update is marked Delayed or At risk. The activity's row in the Results chain shows how late it is, and Needs follow-up there shows only these activities.

  1. Open your WOP and select Monitoring → Implementation alerts.
  2. Select Follow up on the activity.
  3. Choose Log progress and the reason and say in the remarks why it is late and what happens next, Reschedule to set a new completion date with the reason, or Mark cancelled if it will not happen.

The alert clears once the activity's progress, date or status changes. A rescheduled activity keeps its first date as Planned. If an activity is more than 30 days late with no update explaining why, the GWOPA focal point sees it in My Workspace too.

The period report lists the late, rescheduled and dropped activities with their explanations under Delays and changes to the plan.

To record a risk, go to Results chain, select Add on the row, then Risk. Enter the description, category, Likelihood, Impact, Owner and Mitigation plan. Risks rated High for likelihood or impact appear under High-priority risks on the Dashboard.

Check programme contributions

  1. Open your WOP and select Logframe → Programme contribution. It is shown for WOPs in a programme.
  2. Read How this is calculated and open View evidence. Look for records marked Not counted.
  3. To change what counts, go to Logframe → Indicators and progress and select the link icon on the indicator.
  4. Under Contributes to programme indicators, select only the programme indicators this indicator really measures, then select Save.

A Viewer can see a WOP's links but cannot change them. A Content Contributor or Administrator on the WOP can add, change, mark reviewed or remove a link, and so can GWOPA staff. Linked indicators with no reading add nothing to the programme figure. To remove a wrong link, use the delete icon in View evidence. This keeps the indicator and its readings. To count people, see Counting people reached.

Prepare a report

  1. Open your WOP and select Reports → Period reports.
  2. Find the period under Narrative reporting schedule and select Write report or Continue report.
  3. Write the Summary.
  4. For each working area, complete Progress this period, Key achievements, Challenges and how they were addressed and Plans for the next period.
  5. Add Lessons learned and Support needed, and attach files under Annexes.
  6. Select Save report and check that it shows All changes saved. Saving sends nothing to GWOPA.
  7. When the report is ready, select Submit to GWOPA, review the checklist and add a note if needed.

The results for the period come from your monitoring data. You can submit with gaps if nothing is under Must fix, but the reviewer will see them. Submitting preserves the report and its results, so later edits do not change the submitted version. Select the history icon to see each submitted revision.

Types of report

TypeWhat it isSent to GWOPA?
Scheduled narrative reportThe report for a period in the schedule. Six-month periods are created from the WOP's dates and can be adjusted by GWOPA.Yes, when you submit it
Earlier or recreated reportA report from before this workflow, filed under its period, which shows as Closed. Report (recreated) is rebuilt from the reports on record.No action needed
Word and Excel exportsExport to Word on a report and Export on a list or logframe download a copy.No
Financial reportingThis follows a separate timetable and is not part of the narrative report. Financial contributions on Overview are project records, not a submission.Ask your focal point how to submit

Respond to review comments

Returned work appears in My Workspace. See You were not told about a return.

A returned report

  1. Go to Reports and select Continue report or Write report for the period.
  2. Read the note at the top, the Comments on the whole report and the Review comments under each working area.
  3. Make the changes and tick Addressed on each comment.
  4. Select Save report, then Submit to GWOPA.

A returned WOP

GWOPA's comment appears at the top of the WOP page. Make the changes, then select Submit.

A returned closeout

The WOP goes back to Active and GWOPA's comment appears on the Close-out tab. Select Prepare closeout, make the changes, select Save closeout, then Submit closeout.

Complete WOP closure

  1. Open your WOP and select Close-out, then Prepare closeout.
  2. Answer the four checks: Final results verified, Final financial report completed, Outstanding activities resolved and Partner sign-off completed.
  3. Complete Lessons learned and Sustainability or continuation plan, and add Replication potential if relevant.
  4. Select Save closeout.
  5. Select Submit closeout.

Prepare closeout appears only for the WOP team, once the WOP is Active. If you can't prepare closeout, the tab shows the reason.

Submit closeout appears only when all four checks are Yes, both required texts are complete, a focal point is assigned, and every reporting period is Verified or Closed. Otherwise the tab shows the reason.

The four checks are your team's own confirmations, so agree who confirms each one and keep the supporting records. After you submit, the record is read-only and the status is Closeout awaiting review. When GWOPA approves it, the WOP becomes Complete. If GWOPA returns it, see Respond to review comments.

Why a WOP can stay Active after its end date

Reaching the end date does not change a WOP's status. It stays Active until closeout is approved, and the Dashboard shows Past end date in the meantime. Many WOPs from the previous portal are in this position.

What the figures mean

These measures answer different questions. A good result on one does not imply a good result on another.

MeasureWhat it tells youHow it is set
Activity statusWhere the planned work stands: Not started, On track, Delayed, At risk, Overdue, Completed or CancelledThe activity's status, dates and latest progress update. It is Completed when its status is Completed or its latest update is Completed
Indicator achievementHow far a result has moved from baseline to target(Latest value − baseline) ÷ (target − baseline), shown from 0% to 100%
Capacity-change stageHow far the change has taken hold for a capacity outcome, from stage 1 to 4Your team's assessment, recorded each period on the capacity outcome's capacity change stage indicator
Partnership-health scoreHow well the partnership is working, from 1 to 3Your partners' agreed score for each of the eight criteria

On an output, the line under its percentage counts its activities completed, such as 3 of 5. Its percentage shows what its own indicators achieved. An output can have every activity completed and still show low achievement. Cancelled activities are not counted.

An empty value means nothing was measured or reported. Zero is a measurement, meaning the result was measured and was zero. Never enter zero to fill a gap.

Period and cumulative values

Project progress uses the most recent reading. It does not add readings together. So Value must show where the indicator stands on the As of date.

If the indicator isEnter in ValueExample
A count over the WOPThe cumulative total to dateStaff trained, documents produced
A level at a point in timeThe level measured on that dateNon-revenue water of 38%
A figure defined for a yearThe figure for that year, with a target set the same wayWater sold in the year

If the target is 200 staff trained over the WOP, and 50 were trained in the first period and 30 additional staff in the second, enter 80 as the cumulative total. Count each person once where the indicator measures unique staff. With a baseline of zero, progress shows 40%.

Fields labelled "this period"

Some forms also ask for men and women, or participants, added this period. Enter only the new people here. In the example above, enter the 30 additional staff split by sex. The portal adds them to the previous total and suggests 80 in the total field. Reports add these fields together across the updates in a period. Correct the total if someone was already counted.

Annual and cumulative programme results

For programme indicators, GWOPA sets whether results are annual or cumulative. Enter your readings in the same way. The programme calculation then selects the readings it needs, and some calculations use your highest reported value. See How this is calculated on Programme contribution.

Counting people reached

Report people who gained access or a defined service improvement supported by the WOP. Explain the calculation and evidence. Use changes in the utility's total service population only where they measure the intended result. An increase in service population does not automatically mean people gained access through the WOP: population growth, revised estimates and other investments may contribute.

TermMeaningExample
Total population servedEveryone the utility serves. This describes the utility and is not a WOP result.520,000 people in the service area
New accessPeople who had no service before and now have it because of WOP-supported work3,000 people in a newly connected settlement
Improved existing servicePeople already served whose service meets a defined improvement8,000 people moving from 6 to 18 hours of supply a day

Avoid counting the same people more than once

  • Link one headcount indicator per population to a programme indicator. If one indicator counts people served and another counts households connected in the same area, link only one.
  • Do not add new access and improved service together where the same people benefit from both.
  • Do not count people again in a later period. Report the running total.

How the programme figure is calculated

For a linked people-reached indicator, the portal takes your highest reported value minus the baseline. It cannot tell why the figure rose, so link only an indicator that measures people reached through the WOP, and explain the basis in Remarks.

Households and connections

A multiplier applies only if your readings count households or connections and you turn on Readings are households / connections under Unit of count. The portal then multiplies the increase by the programme's people-per-household figure. This figure comes from the programme's calculation settings, not from your entry. View evidence shows the baseline, highest reported value, multiplier and increase. Do not turn this on if your readings already count people.

Read the Dashboard

Indicator coverage

This counts an indicator only when both its baseline and target hold a usable value, which is a number, or text on a Non-quantified indicator. An indicator missing either one is listed under Needs attention on the Indicators and progress tab.

Latest reporting period

The line under this figure separates what the records show:

  • Submitted on time or submitted late counts reports submitted through the portal against their due date.
  • Earlier reports on file are periods closed with reports from before this workflow. These are shown by the date the report was filed, and are not counted as portal submissions.
  • With no report on record means closed periods with no report. This means the information is missing. It does not mean the report was late.

Troubleshooting

You cannot find a WOP

Select All WOPs and clear the filters. If you still cannot find the WOP, ask your focal point to check your access.

You cannot see edit buttons

Editing controls are hidden if your role on the WOP is Viewer. Check Team & access and ask your focal point if you need a different role.

An operator profile is incomplete

Partner accounts cannot open organization profiles. Ask your focal point to add the organization type, main services and service level.

You were not told about a return

Returned work appears in My Workspace, and the portal may not send you a separate message. Check it regularly while your work is under review.

A report cannot be submitted

Check that an indicator update is dated within the period, using its As of date. The WOP must also be Active and have a focal point.

The portal says the record has changed

Someone else saved the record after you opened it. Copy your text, refresh the page, check the latest version and enter your changes again.

A section has no form

Staff with improved capacity and Plans to improve partnership practices show earlier records. New entries cannot be added there. Record improvement plans in the Narrative of a partnership health score.

Get help

Start with your WOP's GWOPA focal point, who is named on the Dashboard and Overview. For account questions, email unhabitat-gwopa@un.org.